Most of Saturday, February 20, was spent moving dirt to clear away a berm along the north side of the pond. The berm will be replaced with trestle and a bridge. The remainder of Saturday's work was laying out the west loop of the lower track. We worked through a sprinkle of rain on Sunday, February 21, to continue laying out the lower track west loop and the upper track north loop. The GreenBee crew hauled in the granite boulders on Monday, February 22.
The center of this shot is where Tunnel #2 will be.
The entrance to Tunnel #2 from a slightly different angle.
Tunnel #3 will be next to the concrete block that is holding up the north end of the bridge.
This part of the track before the bridge will be in Tunnel #4.
Tunnel #5 will be take the track through this cut to the bridge.