The Lancaster and Northwestern
Railroad Club
Saturday and Sunday, March 13 and 14. We dug out under the north end tracks and put in road bed. We leveled the road bed in the tunnels and clamped the tunnel rail in preparation for pouring cement floors in the tunnels.
Fred brought his longest car to check clearance in the tunnels. Smooth!!!!
We staked track across the middle of the layout connecting the north and south halves. This track will all be trestled.
Top
Outdoor Layout page 10 Next
Outdoor Layout page 8 Previous
Outdoor Layout page 7
Outdoor Layout page 6
Outdoor Layout page 5
Outdoor Layout page 4
Outdoor Layout page 3
Outdoor Layout page 2
Outdoor Layout page 1
Home
